Woodridge Park District Athletic Recreation Center


Woodridge, IL




Williams Architects & Woodridge Park District




Mechanical Engineering
Electrical Engineering
Plumbing Engineering
Fire Protection Engineering

Project Description

WT Group’s MEP Team provided HVAC, Plumbing, Electrical and Sprinkler Engineering services for the new ±75,000 square foot Athletic Recreation Center.

Services Included:

  • Schematic Design
  • Design Development
  • Construction Document
  • Bidding and Negotiations
  • Construction Administration
  • Project Closeout

Design Features:

  • Walking/Jogging Track
  • Cardio/Weight fitness area and aerobic room
  • Gymnasium
  • Ropes Course
  • Indoor artificial turf field
  • Multi-Purpose room, community resource center room, and child watch room
  • Warming kitchen/concessions room
  • Locker rooms

Mechanical System Incorporates:

  • Multiple VAV rooftop units and VAV boxes with hot water reheat serve each zone
  • High efficiency boilers provide hot water to VAV reheat coils
  • A direct digital control system provides control and monitoring the entire HVAC system

Plumbing System Incorporates:

  • Sustainable design practices include the use of low-flow fixtures, grease waste system, Interior storm system for roof drainage, sanitary and waste system and a domestic water distribution system.

Electrical System Incorporates:

  • 1200-AMP, 277/480V, 3 phase electrical service with surge project
  • Exterior LED lighting and interior LED lighting with daylight harvesting
  • Multi-level gymnasium and turf field lighting
  • Voice evacuation fire alarm system